A gravel road bordered by a rustic log rail fence leads past dark-sided houses with metal roofs among tall pine trees.

Heat Pump Installation in Blanding, UT

Tell us about the job

Takes about a minute. No obligation.

New system or replacementHeat PumpSan Juan County, UT
Step 1 of 2

What ZIP code is the job in?

About a third of homes in San Juan County heat with utility gas, more than any other fuel. Electricity comes in second at 17.5 percent, with propane close behind at 16.6 percent. That split tells you something if you're comparing a heat pump to what's already common here. A heat pump installed alongside existing gas line can work as a dual fuel setup, letting the furnace take over on the coldest days while the heat pump handles the rest of the year. If your home is already on electric heat, swapping to a heat pump is a more straightforward changeover since the fuel source doesn't change. Either way, what you have now is the starting point for what a contractor will size and recommend.

8 months
October through May, your system heats
3 months
June through August, it cools
23°F
the average winter night it heats against
89°F
the average summer afternoon it cools against
Isometric cutaway illustration of a single-story house showing interior ductwork, an indoor air handler, and an outdoor condenser unit connected by lines along the exterior wall.
Your system heats October through May and cools June through August.

NOAA nClimDiv, 1991–2020 normals

Utah homes paid 12.22 cents per kilowatthour in 2024, well below what most of the country pays.

A heat pump still beats electric resistance heat here, but cheap power means the top-tier efficient model takes longer to pay for itself. Pick one for fit and reliability first.

Heat runs eight months here, so get a heat pump in before October

Cooling runs June through August
Heat runs October through May
12 hail events from 2015 to 2024

A heat pump here just needs to be sized right, nothing more. Overnight lows average 23°F across December, January and February, so the unit has to keep up on those cold mornings, but that's within what a correctly sized system handles without add-ons. Snow is the bigger factor day to day. Winter storms are common here, and that matters more for where the outdoor unit sits than for its size. It needs clearance to shed snow and drain, and a spot where ice off the roof won't land on it. Hail is rare by comparison, so it's not something to plan around. None of this calls for oversizing or an upgraded tier, just a standard system set up right for the spot it's in.

Any heat pump installed here has to meet zone 5B's efficiency minimums

Zone 5B means any heat pump installed here has to hit 14.3 SEER2 and 7.5 HSPF2 at minimum, if it was built after January 2023. That's the floor, not a suggestion, so it already narrows down what a contractor will put in front of you. A federal tax credit is available for qualifying equipment, worth asking about when you're comparing models.

Find a contractor
A man in a dark shirt and brown pants carries a worn canvas tool bag up concrete steps toward a gray-blue front door of a house with horizontal siding and a potted shrub.
A gray outdoor HVAC unit mounted on a concrete pad beside a house with gray lap siding and a stone foundation.

The number on the label is an average over a lot of running time, not one cold morning

SEER2 and HSPF2 are measured the same way, as an average over a lot of running time, not a single afternoon or a single cold morning. SEER2 covers cooling, HSPF2 covers heat, and both compare total output against total power drawn. A higher number on either means the unit pulls less power for the same comfort, but that only holds for a given size of unit. It doesn't mean a bigger house gets covered, and it doesn't mean the unit runs less often. On the coldest mornings a highly rated heat pump still runs just as long as a lower rated one, it just draws less power doing it. The rating shows up most in the milder stretches of spring and fall, when the system is cycling on and off instead of running flat out, since that's where the difference in efficiency actually shows on a power bill.

Sizing is a room by room calculation, not a swap

A contractor works out heat pump size using a load calculation that looks at square footage, window area, insulation, and how many walls and ceilings face outside air. It's done room by room, then added up. Replacing an old furnace or AC with a heat pump sized to match the old unit skips this step and can leave the house with equipment that doesn't match how it actually holds heat.

Oversized runs worse than undersized

A heat pump that's too big for the house satisfies the thermostat fast, then shuts off. Short cycles like that mean the system never runs long enough to pull moisture out of the air, so the house can feel clammy even at the right temperature. It also means more stopping and starting, which wears on the compressor over time. A unit that's too small just runs longer to keep up, which is the easier problem to live with.

The equipment itself is one line item, and it's not the only one that moves the price. Ductwork condition matters as much as the unit. If the ducts were sized for a furnace and AC, a contractor may need to modify them for the airflow a heat pump needs, especially at lower speeds where it runs most of the time. Electrical capacity is another. A heat pump runs on electric power only, so the panel and circuit have to be able to carry it, and an older panel sometimes needs work before the unit can go in. Where the outdoor unit can sit, how far the line set has to run, and whether a crane or extra labor is needed to move old equipment out all factor in too. None of this shows up on the spec sheet, only on a site visit.

Install day starts with the old equipment coming out, then the new pad or bracket goes in for the outdoor unit. Line sets get run between outdoor and indoor units, and if the ducts need modifying for airflow, that work happens before anything gets connected. Once the lines are run, the system gets evacuated to pull out air and moisture, then charged with refrigerant to the amount that unit calls for. Electrical hookup comes next, tying into the panel or circuit work done earlier. Before anyone leaves, the system runs through a full cycle in both heating and cooling so the contractor can check airflow at the vents and confirm the thermostat is talking to the unit correctly. A straightforward swap with ducts already in good shape takes less time than a job that needs panel work or duct changes, so the scope gets set before the crew shows up, not during.